Results 1 to 2 of 2

    • Join Date: Oct 2009
    • Posts: 7
    • Post Thanks / Like
    #1

    could someone help me out?

    Hi how you doing?

    I recently have written about bidding documents, and

    it is simply needed to be checked for awkward grammar and usage.

    The sentences doesn't have to be perfect, but I wanna

    have somebody to read and make comments for this.

    Before I start to write my article, I wanna say thank you all who read this.

    Have a great one :D



    The importance of system maintenance activities

    “Informatization of General Education Schools of the Republic of Uzbekistan” project shall contain following purposes;

    1) The project shall make the improvement of the education quality through effective use of Information and Communication Technologies (ICT) in schools. Besides, the project shall stimulate to develop a common information education environment in basic education via provision of computer equipment to schools.


    2) The project scope includes the procurement and installation of PC, related equipments, and the CDMEP system which produces and distributes e-learning materials students at 1551 schools within Uzbekistan territory.

    The maintenance service is a vital matter since elements related to a fundamental problem can be solved by appropriate maintenance service as both stable operation and utilization of the system are necessary to achieve the project goal.

    Systematic approach for on-site maintenance service

    The maintenance service, which contains equipment management, repair, restore, and etc, are composite procedures in order to keep the best condition of the system operation. Therefore, the supplier will efficiently and systematically handle maintenance jobs which is appeared when this project is developed, and the supplier will provide the best maintenance service to handle an unexpected defect immediately through creating a separate organization for the system maintenance based on post-warranty service within certain period of time and scheduling particular activities plans

    The computers and accessories will be procured with three-year comprehensive warranty covering on-site maintenance inclusive of labour and spares. Other equipment will carry one-year warranty, unless specially provided for in the Work order to the Executing Agency.

    VI.2. Warranty and Maintenance plan & schedule
    VI.2.1. Detailed Activity Plan
    VI.2.1.1. Maintenance strategy

    Procure associated spare parts

    The time for procuring the spare parts and the system recovery will be minimize by procuring equipments and associated spare parts which is supplied to a maintenance organization located in each target region

    Nationwide Operation of Maintenance Organization

    In order to do a prompt response for a defect, a maintenance organization located in each target region including help-desk will be formed, and a network of emergency communication is also created to serve maintenance service all the time.


    In addition, maintenance web site will be run for requesting about system uses and checking a progress status of a defect, meanwhile relative technical data is shared in the web site.


    Prompt Maintenance Service to Minimize Recovery Time

    To minimize system recovery time, the supplier will provide a network of emergency communication, handling measures for each defect, and an emergency measure list against a defect.

    The supplier shall establish for a defect preparation followings;
    1) Establish emergency recovery system for the members
    2) Establish the countermeasures
    3) Prepare and distribute an emergency measure list


    VI.2.1.2. Scope of warranty and maintenance Warranty and Maintenance

    Scope of warranty and maintenance will be limited only for computers, other hardware (including peripherals), and standard software delivered by the supplier while the supplier is performing the task. Besides, supporting details are largely divided as recovery activities for a defect and system upgrades. Scope and technical support details of each item shall be followed below conditions:


    Maintenance target

    Products, computing hardware of ECC and CDMEP and other electronic learning equipments at ECC, supplied and installed by the supplier in accordance with Technical Requirement of Bid Document Section VI.


    Maintenance activities

    Maintenance activities: upkeep of equipment by finding a defect reason within the warranty period at supplier’s cost.

    Free maintenance activities by finding a defect reason during warranty period

    Software upgrade: all new versions, releases, and updates of Standard Software, related documentation and technical support services, and software re-installation when hardware environments are changed.

    Preventive measures: free preventive measures to make better system maintenance service and system credibility

    Followings are not included in warranty and maintenance:
    Exclusion subject of warranty and maintenance

    1) Defects due to a purchaser’s purpose or natural disaster

    2) The system has a negative influence by modifications, additions, and adjustments via third party, not approved by the supplier.

    3) The supplier will make a decision through a discussion with the purchaser when additional new requirement except current system features is raised even if it is in the free warranty period.


    <Maintenance support system>


    VI.2.1.3. System and procedure of maintenance organization
    To support stable warranty and maintenance service, the supplier shall create a help desk, maintenance team, and technical support team belonging to each regional technical support center. Detail procedures of the maintenance shall be defined to give an effective and prompt support for a defect within warranty period.

    Separate team organization for stable maintenance
    The service center shall be established for maintenance in both Uzbekistan and Korea, and the supplier shall divide in four parts to cover entire Uzbekistan territory. For each part, a help desk, a technical support team shall be created to support system operation.
    Task assigning for each maintenance part

    VI.2.1.4. Maintenance schedule


    VI.2.2. Warranty Policy

    The mechanism for maintenance of the computers and other equipment

    1) The computers and accessories will be procured with three-year comprehensive warranty covering on-site maintenance inclusive of labour and spares. Other equipment will carry one-year warranty, unless specially provided for in the Work order to the Executing Agency.
    2) After the warranty period, maintenance service will be provided by the Executing Agency or manufacturer on Annual Maintenance Contract, on case-to-case basis or other arrangement to be worked out by the Executing Agency.
    3) To meet the cost of post-warranty maintenance of computers etc., the schools should raise revenue by introducing computer fees in the school, conducting of additional training courses outside school hours, and conducting training course during summer/ winter vacation periods for students as well as public.

    * Detail compliance of warranty of supplied H/W and S/W is referred at Appendix 6. Technical responsiveness checklist technical requirement.

    Task assigning for each maintenance part

    Country Organization Unit Role
    Uzbekistan Maintenance Head Quarter Contract management about entire maintenance task related on this project
    SVC Center • Overall maintenance task management for each help desk belonging to each region
    • Grasp both maintenance problem and improvement detail
    • Accumulation of defect records for each help desk belonging to each region
    Tech Support Team • Maintenance skill support for each help desk belonging to each region
    • Technical support for server equipment and server operating technology
    • Optimization of the system software
    • Operation support of the system software
    Help Desk • User requests receipt and management
    • Implementation of project defect maintenance
    • Management of defect records
    • Management of maintenance staff and schedule
    Korea SVC Center • Communication with Uzbekistan SVC center
    • Technical support of maintenance for each region in Uzbekistan
    Uzbekistan SVC Center
    Maintenance Support Team Communication between the supplier and the maintenance support team
    Tech Support Team • Technical support for entire system operation
    • Technical support for Uzbekistan technical support team


    Human Resource Utilization

    In the conduct of this project, the supplier has set an operation plan including a ground rule to utilize Uzbekistan domestic labor forces. Especially, one hundred percent domestic labor force in Uzbekistan shall be utilized for maintenance service.

    Help desk

    *Receipt service request
    * Defect management
    *Customer communication channel

    Emergency Maintenance

    *Analysis the reason of a defect and troubleshooting

    Technical Support

    *Technical support to increase the system performance

    Support Education

    *education al support to teach how users can handle each defect

    • Member Info
      • Member Type:
      • English Teacher
      • Native Language:
      • American English
      • Home Country:
      • United States
      • Current Location:
      • United States

    • Join Date: Oct 2008
    • Posts: 909
    • Post Thanks / Like
    #2

    Re: could someone help me out?

    Hi, joungmin:

    I responded to another related post of yours re: the word informatization. Reading this post gives me a better idea of what you are trying to do.
    The post is too long for me to edit in depth, but here are some comments/suggestions:

    [QUOTE=joungmin;536412]Hi how are you doing?

    I recently have written about bidding documents, and

    it is simply needed to be checked for awkward grammar and usage.

    The sentences don't have to be perfect, but I want to

    have somebody to read and make comments for this.

    Before I start to write my article, I want to say thank you to all who read this.

    Have a great one :D



    The importance of system maintenance activities

    “Informatization of General Education Schools of the Republic of Uzbekistan” project shall contain following purposes;
    If this is the title of the project and you can't change it, then there's nothing you can do.
    If, however, it's the name you gave it, you might consider changing it to something like: Technology Modernization of General Education Schools...


    1) The project shall make the improvement improve of the educational quality of General Education Schools (Public Schools?) through effective use of Information and Communication Technologies (ICT) in schools. Besides Additionally, , the project shall stimulate to develop the development of a common information education environment in basic education via provision of computer equipment to schools.


    2) The project's scope includes the procurement and installation of PCs, related equipments, and the CDMEP system, which produces and distributes e-learning materials for students at 1551 schools within Uzbekistan territory.

    The maintenance service is a vital matter since elements related to a fundamental problem can be solved by appropriate maintenance service as both stable operation and utilization of the system are necessary to achieve the project goal.
    Ongoing professional maintenance will assure the speedy resolution of technical problems within the system. Without an effective maintenance component, there is no guarantee that the project goals will be met.

    Systematic approach for on-site maintenance service

    The maintenance service, which includes equipment management, repair, restoration, (and etc there shouldn't be an 'etc' here. Prospective clients should know exactly what the maintenance service includes, (are composite procedures what does this mean?) in order to keep the best condition of the system operation. Therefore, the supplier will efficiently and systematically handle any maintenance jobs which may appeared occur when this project is developed in operation. (and the supplier will provide the best maintenance service to handle an unexpected defect immediately through creating a separate organization for the system maintenance based on post-warranty service within certain period of time and scheduling particular activities plansWhoa! This sentence is too long and complicated! Can you simplify?)


    The purchase price of the computers and accessories will be procured with include a three-year comprehensive warranty covering on-site maintenance inclusive of labour and replacement parts. Other equipment will carry a one-year warranty, unless specially specifically provided for in the Work Order to the Executing Agency.

    VI.2. Warranty and Maintenance plan & schedule
    VI.2.1. Detailed Activity Plan
    VI.2.1.1. Maintenance strategy

    Procure associated spare parts

    The time for procuring the spare parts and the system recovery will be minimized by procuring equipments and associated spare parts which will be supplied to a maintenance organizations located in each target region.

    Nationwide Operation of Maintenance Organization

    In order to do a prompt response for a defect, a maintenance organization located in each target region including help-desk will be formed, and a network of emergency communication is also created to serve maintenance service all the time.
    In order to assure prompt repair of any defects, a maintenance organization located in each target region will be formed, and a network of emergency communication created. These technical support organizations will be readily accessible through individual help-desks.


    In addition, a maintenance web site will be run created to handle questions about system uses. and Clients will also be able to use the website to check the progress status of a problem resolution, and locate relevant technical data. is shared in the web site.


    Prompt Maintenance Service to Minimize Recovery Time

    To minimize system recovery time, the supplier will provide a network of emergency communication, handling measures for each defect, and an emergency measure list against a defect. What is the difference between this and the previous item?

    I hope this is helpful,

    Petra

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •