Results 1 to 2 of 2
  1. #1
    ben9108 is offline Member
    • Member Info
      • Member Type:
      • Student or Learner
      • Native Language:
      • Chinese
      • Home Country:
      • China
      • Current Location:
      • China
    Join Date
    Nov 2005
    Posts
    114
    Post Thanks / Like

    Default Clear debris from channel

    I would be grateful if someone could help me to correct my letter. Thanks

    Dear Colleague

    Further to routine maintenance inspection to ascertain the extent of the slope for TGV, I found that some drainage channels, sand traps and slope surface have been clogged by accumulated debris. Due to the forthcoming rainstorm event, I would be grateful if you could arrange contractor to keep the above debris out of all channels, traps and relevant surface within our slope management area in order to reduce the probability of instability of slopes and retaining walls.

    Enclose herewith photos and site part plan for your information and necessary action.

    Technical Officer

  2. #2
    curmudgeon's Avatar
    curmudgeon is offline Key Member
    • Member Info
      • Member Type:
      • Retired English Teacher
      • Native Language:
      • English
      • Home Country:
      • UK
      • Current Location:
      • UK
    Join Date
    Mar 2006
    Posts
    1,657
    Post Thanks / Like

    Default Re: Clear debris from channel

    Quote Originally Posted by ben9108 View Post
    I would be grateful if someone could help me to correct my letter. Thanks

    Dear Colleague

    Further to a routine maintenance inspection to ascertain the extent of the slope for TGV, I have found that some drainage channels, sand traps and slope surfaces have been clogged by accumulated debris. Due to the possibility of a future rainstorm, I would be grateful if you could arrange for the contractor to ensure that debris is removed from all the channels, traps and relevant surfaces within our scope management to ensure that the probability of instability of slopes and retaining walls is reduced.

    Please find enclosed photos and site part plan for your information and necessary action.

    Technical Officer

Similar Threads

  1. message clear
    By Haroon in forum Ask a Teacher
    Replies: 2
    Last Post: 15-Jul-2006, 21:01
  2. heavy heart and clear head?
    By bosunyum in forum Ask a Teacher
    Replies: 1
    Last Post: 01-Apr-2006, 13:02
  3. Clear and fine?
    By NewHope in forum Ask a Teacher
    Replies: 8
    Last Post: 11-Oct-2004, 05:16
  4. steer clear of you
    By zeppy in forum Ask a Teacher
    Replies: 1
    Last Post: 17-Dec-2003, 16:04

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •