Results 1 to 2 of 2
  1. #1
    Zoe2008 is offline Key Member
    • Member Info
      • Member Type:
      • Student or Learner
      • Native Language:
      • Korean
      • Home Country:
      • South Korea
      • Current Location:
      • China
    Join Date
    Jan 2008
    Posts
    1,627
    Post Thanks / Like

    Default One more correction

    1. Recap our conversation two days ago; you are going to check the record for which factory has audited by BV for the customer xxx, is there any update?

    2. Sorry to keep you waiting. We already contact Lily to arranged these 10 cartons spare parts with your other goods shipped by one 20’ container and ETD Yantian xxx and ETA Mexico on xxx. Please find attached the shipping document for your reference, if there is any problems please contact us again.

    3. The original production for 1860 pcs of HU583 was 17 to 20 May. We booked inspection on 21 May, but cancelled. Because the factory was switched the production line to their other urgent goods and also the material is short; therefore, it is postponed to 26 to 29 May now, and will be ready for inspection on 30 May. I already told Vivian to pull in one more day earlier to catch vessel closing on 30 May; otherwise, it will be delay again. She will confirm the schedule to me today.
    Last edited by Zoe2008; 20-May-2008 at 17:38.

  2. #2
    Anglika is offline No Longer With Us
    Join Date
    Oct 2006
    Posts
    19,448
    Post Thanks / Like

    Default Re: One more correction

    Quote Originally Posted by Zoe2008 View Post
    1.To recap our conversation of two days ago: you are going to check the record of which factory has been audited by BV for the customer xxx. Is there any update?

    2. Sorry to keep you waiting. We have already contacted Lily to arranged for these 10 cartons spare parts to be shipped with your other goods in one 20 container, ETD Yantian xxx and ETA Mexico on xxx. Please find attached the shipping document for your reference. If there are any problems please contact us again.

    3. The original production for 1860 pcs of HU583 was 17 to 20 May. We booked inspection on 21 May, but cancelled because the factory had switched the production line to their other urgent goods, and also the materials were short; therefore, production is postponed to 26 to 29 May now, and will be ready for inspection on 30 May. I have already told Vivian to pull in one more day to catch vessel closing on 30 May; otherwise, it will be delayed again. She will confirm the schedule to me today.
    .

Similar Threads

  1. Problem with sentence correction
    By sagarshanky in forum Ask a Teacher
    Replies: 1
    Last Post: 08-Sep-2007, 09:07
  2. grammar correction for GMAT exam
    By drrohitbaslas in forum Ask a Teacher
    Replies: 1
    Last Post: 15-Jan-2007, 04:41
  3. Article correction - please help
    By petr in forum Ask a Teacher
    Replies: 1
    Last Post: 22-Mar-2006, 06:17
  4. On Spelling Correction and the Collective Knowledge of Web Users
    By Red5 in forum Text Analysis and Statistics
    Replies: 3
    Last Post: 13-May-2005, 15:55

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •