I am preparing a written test about processes in the building sector . This is a shallow desciption about foundation works. I would apreciate your advices and constructive comments.
Before the excavation of the space where the basement will be placed, it is possible to use a pile screen as a supporting structure. This retaining wall must be anchored to the soil by tiebacks or soil anchors. Once the whole basement space has been excavated, two kinds of foundation can be used. shallow foundations (such as spread footings, foundation walls, etc.) or deep foundations (concrete, steel or wood piles). A drainage system is required in the outer side of a retaining wall, placing an open drainage pipe in the bottom of the trench and backfilling it with gravel. A conveniently protected asphalt membrane sticked to the wall will ensure it watertighness. An inner wythe in front of the piles screen and a draining channel inthe air space will evacuate eventual water seeping or condensation. A concrete ground slab with a base course of gravel can be placed directly on the compacted soil when building a basement parking. However, for different uses, a crawl space under the first floor system will be a better option.
I am preparing a written test about processes in the building sector . This is a shallow desciption about foundation works. I would apreciate your advices and constructive comments.
Before the excavation of the space where the basement will be placed, it is possible to use a pile screen as a supporting structure. This retaining wall must be anchored to the soil by tiebacks or soil anchors. Once the whole basement space has been excavated, two kinds of foundation can be used. shallow foundations (such as spread footings, foundation walls, etc.) or deep foundations (concrete, steel or wood piles). A drainage system is required in the outer side of a retaining wall, placing an open drainage pipe in the bottom of the trench and backfilling it with gravel. A conveniently protected asphalt membrane sticked to the wall will ensure it watertighness. An inner wythe in front of the piles screen and a draining channel inthe air space will evacuate eventual water seeping or condensation. A concrete ground slab with a base course of gravel can be placed directly on the compacted soil when building a basement parking. However, for different uses, a crawl space under the first floor system will be a better option.