chowbarry
Junior Member
- Joined
- Apr 17, 2008
- Member Type
- Student or Learner
- Native Language
- Chinese
- Home Country
- China
- Current Location
- China
Can anybody help me correct the following e-mail? Thank you.
Dear Mr. Powell,
With reference to our earlier telephone conversation, I would like to reiterate that our technical division have revealed that there will be no excavation, but minor underground cable line laying work to be carried out outside the entrance of the subway (see the blue arrow sign shown on the photos attached below) and so no facilities under your department's management are expected to be influenced by the work. However, excavation works aiming to connect the cable duct or pit are planned to implement on the other side of the subway or after passing through the subway, but these also appear not to cause any adverse effects on your facilities there, such as ramps, water points as well as ground tiles.
To facilitate the realization of the work proposal, please let us know your feedback on our technical division's above further information on the proposal by 10.05.2016 and we really look forward to receiving your approval of the work and hearing the earliest commencement date of the work. Last but no least, please advise us if the work regarding the built up of a new cut-out to the newly-installed pillar box engineered by your construction division may have a clash with our technical division's above scheduled work.
Yours sincerely,
CB
Dear Mr. Powell,
With reference to our earlier telephone conversation, I would like to reiterate that our technical division have revealed that there will be no excavation, but minor underground cable line laying work to be carried out outside the entrance of the subway (see the blue arrow sign shown on the photos attached below) and so no facilities under your department's management are expected to be influenced by the work. However, excavation works aiming to connect the cable duct or pit are planned to implement on the other side of the subway or after passing through the subway, but these also appear not to cause any adverse effects on your facilities there, such as ramps, water points as well as ground tiles.
To facilitate the realization of the work proposal, please let us know your feedback on our technical division's above further information on the proposal by 10.05.2016 and we really look forward to receiving your approval of the work and hearing the earliest commencement date of the work. Last but no least, please advise us if the work regarding the built up of a new cut-out to the newly-installed pillar box engineered by your construction division may have a clash with our technical division's above scheduled work.
Yours sincerely,
CB