    Progress report on repair works

    Please help me correct the following draft progress report on repair works at my managed clubhouse. Thank you.

    Dear Sir,

    I would like to report you the progress of various repair works at our clubhouse, which is obviously far behind our forecasted schedule. Details are as follows:


    1) I have issued a letter to the term contractor on horticultural work, advising them that as the progress of the repair works unexpectedly stalls, they have to pay special attention to carry out imminent remedial measures on some defective trees, mostly having wounds on their trunks caused by careless handling of the site workers.

    2) I have issued a letter to the cleaning contractor, stating that facing an unforeseeable delay of the toilet improvement works at our clubhouse, the earlier proposed requirements for the number of cleaning workers need to be changed from 4 to 2 until further notice and we intend to pay for the charges incurred from the addition of workers two months later.

    3) I have issued a detailed defects checklist to the main contractor, notably reminding them of adjusting the height of the wash basins, toilet paper dispensers, electronic fans, urinals and filling the gaps between the walls and the handrails.

    4) As we have accidentally found the defectiveness on a drop bar at the car park of clubhouse, we have asked for the assistance of technical division to rectify the drop bar and have swiftly been told to pay for $5,000 for the repair work. Since the drop bar is presently failure to drop down and hence perform the function of resisting the car go away, I am compelled to temporarily cordon off the defective drop bar.

    With the chance of having all defect items fully rectified looking very slim, I suggest to shift the official completion date of the whole work to 30.06.2016.

    Your sincerely,
    AA

  1. teechar's Avatar
    • Member Info
      • Native Language:
      • English
      • Home Country:
      • Iraq
      • Current Location:
      • Iraq

    • Join Date: Feb 2015
    • Posts: 2,344
    • Post Thanks / Like
    #2

    Re: Progress report on repair works

    Quote Originally Posted by chowbarry View Post

    Dear Sir,

    I would like to report to you on the progress of various repair works at our clubhouse, which is are obviously far behind our forecast ed schedule. Details are as follows:


    1) I have issued a letter to the term contractor on horticultural work, advising them that as the progress of the repair works has unexpectedly stalled, they have to pay special attention to carry out imminent remedial measures on some defective trees, mostly having wounds on their trunks caused by careless handling of the site workers.

    2) I have issued a letter to the cleaning contractor, stating that facing due to an unforeseeable delay of the toilet-improvement works at our clubhouse, the earlier proposed requirements for the number of cleaning workers needs to be changed from 4 to 2 until further notice, and we intend to pay for the charges incurred from as a result of the addition of workers two months later.

    3) I have issued a detailed defects checklist to the main contractor, notably reminding them of the need to adjust ing the height of the wash basins, toilet paper dispensers, electronic fans, urinals and filling the gaps between the walls and the handrails.

    4) As we have accidentally found the a defectiveness on a drop bar at the car park of clubhouse, we have asked for the assistance of the technical division to rectify the drop bar and have swiftly been told to pay for $5,000 for the repair work. Since the drop bar is presently fails ure to drop down, and hence fails in performing the its intended function of acting as a barrier to cars leaving, resisting the car go away, I am compelled to temporarily cordon off the defective drop bar.

    With the chance of having all defective items fully rectified on time looking very slim, I suggest to shift the official completion date of the whole work to 30.06.2016.

    Your faithfully, sincerely,

    AA
    .

Similar Threads

  1. Replies: 2
    Last Post: 25-Sep-2014, 15:20
  2. [General] update you on the progress/get you updated on the progress
    By LiuJing in forum Ask a Teacher
    Replies: 1
    Last Post: 09-Jan-2013, 14:48
  3. Replies: 8
    Last Post: 23-May-2012, 11:10
  4. Replies: 1
    Last Post: 30-Aug-2010, 10:27
  5. Process or Progress a report
    By A-C in forum Ask a Teacher
    Replies: 2