Please help me improve the following report on improvement works. Thank you very much.

1) We refer to your recent reminder memo dated 26.08.2016 urging us and our maintenance agent to re-examine the appropriateness of the current water meters at our clubhouse. Indeed, tracing back your previous memos dated from 25.01.2016 to 14.07.2016 about the same issue, we have contacted our maintenance agent, requesting them to carry out urgent improvement work on the water meters so as to comply with your stated standard. However, whilst we are without required professional skills and experience in improving the water meters by ourselves, we are still awaiting the further action from our maintenance agent towards their water meter improvement work, which initially commence on 19.03.2016 indeed. Please be assured that we will continue closely liaison with our maintenance agent on the improvement work and we hope the work, together with a work completion report addressed to you, could be done by this end of this month.

2) The Glorious Garden (GG), with an occupied area of 5,000 square meters, is opened in 01.01.2008 and located at the lower part of the grand roundabout along Birch region. Due to some natural constraints, there has been without the provision of lighting facilities at the GG since its opening, which results in prompting great safety concern about from the members of public and the District Mayors and the suggestion of a feasibility study on lighting facilities installation there is raised accordingly.

Since 2012, we have been tirelessly liaising with the Power Supply Company (PSC), the Transport Department (TD) and the Engineering Department (ED) to carry out feasibility study on the lighting facilities provision at the GG, but we are then informed of the infeasibility of such work due to a concern from the TD about the work's likely affection on the structure of the nearby subways and that from the ED about some technical problems notably the absence of source of power supply to the lighting facilities and they instead propose to work out a technical report on interim measure on the lighting provision.

On 10.08.2016, all the parties involved have held a joint site meeting and finally reached an agreement on the impending implementation of lighting facilities installation work at the GG after sorting out all the above-mentioned problems facing the installation work and we have subsequently received a technical report involving excavation arrangement on the work from the ED on 15.08.2016, with an indication of the estimated work cost of $1.1m and a forecasted work duration of 8 months, effective from 01.10.2016 provided that all the installation subjects comply with the statutory and relevant requirements.
 
Last edited:

tedmc

VIP Member
Joined
Apr 16, 2014
Member Type
Interested in Language
Native Language
Chinese
Home Country
Malaysia
Current Location
Malaysia
Please help me improve the following report on improvement works. Thank you very much.

1) We refer to your recent reminder memo dated 26.08.2016 urging us and our maintenance agent to re-examine the [STRIKE]appropriateness [/STRIKE] adequacy of the current water meters at our clubhouse. Indeed, tracing back your previous memos dated from 25.01.2016 to 14.07.2016 about the same issue, we have contacted our maintenance agent(,) requesting them to carry out urgent improvement work on the water meters so as to comply with your [STRIKE]stated[/STRIKE] standards. However, whilst we are without the required professional skills and experience [STRIKE]in improving[/STRIKE] to improve/upgrade the water meters [STRIKE]by [/STRIKE]ourselves, we are still awaiting [STRIKE]the[/STRIKE] further action from our maintenance agent [STRIKE]towards[/STRIKE] on their water meter improvement work, which[STRIKE] initially[/STRIKE] commenced on 19.03.2016 i[STRIKE]ndeed[/STRIKE]. Please be assured that we will continue to liaise closely [STRIKE]liaison[/STRIKE] with our maintenance agent on the improvement work and we hope the work, together with a work completion report addressed to you, [STRIKE]could be done [/STRIKE] would be ready by [STRIKE]this[/STRIKE] the end of this month.

2) The Glorious Garden (GG), with an occupied area of 5,000 square meters, is opened [STRIKE]in [/STRIKE] on 01.01.2008 and is located at the lower part of the grand roundabout along Birch region. Due to some natural constraints, there has been [STRIKE]without the[/STRIKE] no provision of lighting facilities at the GG since its opening, which [STRIKE]results in prompting[/STRIKE] has resulted in great safety concerns [STRIKE]about from[/STRIKE] being expressed by the members of public and the District Mayors and the suggestion of a feasibility study to be carried out on the provision of lighting facilities [STRIKE]installatio[/STRIKE]n. [STRIKE]there is raised accordingly.
[/STRIKE]
Since 2012, we have been tirelessly liaising with the Power Supply Company (PSC), the Transport Department (TD) and the Engineering Department (ED) to carry out feasibility studies on the lighting facilities provision at the GG, but we[STRIKE] are then[/STRIKE] have been informed of the infeasibility of such work due to a concern from the TD about the likely effect of the work[STRIKE]'s likely affection[/STRIKE] on the structure of the nearby subways and that from the ED, about some technical problems, notably the absence of [STRIKE]source of[/STRIKE] power supply to the lighting facilities and they have instead proposed to work out a technical report on the interim measures on the lighting provision.

On 10.08.2016, all the parties involved [STRIKE]have[/STRIKE] held a joint site meeting and finally reached an agreement on the impending implementation of lighting [STRIKE]facilities[/STRIKE] installation work at the GG after sorting out all the above-mentioned problems facing the installation work. [STRIKE]and [/STRIKE]We [STRIKE]have[/STRIKE] subsequently received a technical report involving the excavation arrangement on the work from the ED on 15.08.2016, with an indication of the estimated work would cost [STRIKE]of [/STRIKE]$1.1m [STRIKE]and [/STRIKE] with [STRIKE]a forecasted [/STRIKE] an estimated work duration of 8 months, effective from 01.10.2016, provided that [STRIKE]all[/STRIKE] the installations [STRIKE]subjects[/STRIKE] comply with all the statutory and relevant requirements.
.
 