Results 1 to 2 of 2
    • Member Info
      • Native Language:
      • Korean
      • Home Country:
      • South Korea
      • Current Location:
      • China

    • Join Date: Jan 2008
    • Posts: 1,628
    #1

    Help

    Further to our conversation, please note that we will arrange the inspection as per your scheduled. But before SGS inspection on June 30, our customer is required to perform the testing as this is a new packing format for w/o inner boxes. Please prepare 3 boxes for the testing of drop, vibration and measurement before 28 June, our customer Mr. Chan arrive to your factory within this two days.

    • Member Info
      • Native Language:
      • Chinese
      • Home Country:
      • Malaysia
      • Current Location:
      • Malaysia

    • Join Date: Jun 2006
    • Posts: 2,130
    #2

    Re: Help

    Further to our conversation (on ???), please note that we will arrange for the inspection as per your schedule. But before the SGS inspection is carried out on June 30, our customer is required to perform the testing as this is a new packing format for ?? without the inner boxes. Please prepare 3 boxes for the testing for 'drop', 'vibration' and 'measurement' before 28 June. Our customer, Mr. Chan will come to your factory within two days.

    not a teacher

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •