Results 1 to 3 of 3
    • Member Info
      • Native Language:
      • Korean
      • Home Country:
      • South Korea
      • Current Location:
      • China

    • Join Date: Jan 2008
    • Posts: 1,628
    #1

    help

    Our QC will arrive BC factory on 11 July, however, they cannot inspect two difference models at the same day, as there are 10000 pcs PD487 which is too large lot for inspection. Therefore, Alan is suggest to move them to July 15 as there is another lot at the same day for inspection which can save the manpower and cost.

  1. Soup's Avatar
    VIP Member
    English Teacher
    • Member Info
      • Native Language:
      • English
      • Home Country:
      • Canada
      • Current Location:
      • China

    • Join Date: Sep 2007
    • Posts: 5,882
    #2

    Re: help

    Our QC will arrive at BC factory on 11 July. They cannot, however, inspect two difference models on the same day. There are 10000 pcs PD487 which is too large a lot for inspection. Alan, therefore, suggests we move them to July 15 with another lot being inspected on that day, which will save on manpower and cost.

    • Member Info
      • Native Language:
      • English
      • Home Country:
      • United States
      • Current Location:
      • United States

    • Join Date: Jan 2008
    • Posts: 2,944
    #3

    Re: help

    Or it might mean . . .

    Our QC will arrive BC factory on 11 July, however, they cannot inspect two different models on the same day because there are 10,000 pcs of the PD487, which is too large for one inspection. Therefore, Alan is suggesting that the inspection be changed to July 15. There will be another lot on the same day needing inspection and combining all jobs can save manpower and costs.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •