Results 1 to 2 of 2
    • Member Info
      • Native Language:
      • Korean
      • Home Country:
      • South Korea
      • Current Location:
      • China

    • Join Date: Jan 2008
    • Posts: 1,628
    #1

    inspection arrangement

    Would you please confirm with us the mass production start date, we need to plan the inspection schedule for you.

    Confirmed with our product manager Mr. Chan, he will lead his term to perform the inspection on August 29. Please ensure there have at least 10% finished goods during the inspection. If there is any change for the schedule, please must advise us one day in advance.


    • Join Date: Oct 2006
    • Posts: 19,434
    #2

    Re: inspection arrangement

    Quote Originally Posted by Zoe2008 View Post
    Would you please confirm with us the mass production start date. We need to plan the inspection schedule for you.

    As confirmed with our product manager Mr. Chan, he will lead his term to perform the inspection on August 29. Please ensure there have there is at least 10% finished goods available for the inspection. If there is any change in//to the schedule, you must advise us one day in advance.
    .

Similar Threads

  1. [Grammar] inspection arrangement
    By Zoe2008 in forum Ask a Teacher
    Replies: 1
    Last Post: 22-Aug-2008, 20:49
  2. inspection arrangement
    By Zoe2008 in forum Ask a Teacher
    Replies: 2
    Last Post: 14-Aug-2008, 16:47
  3. [Grammar] Inspection schedule
    By Zoe2008 in forum Ask a Teacher
    Replies: 1
    Last Post: 12-Aug-2008, 15:48
  4. [Grammar] Inspection problem
    By Zoe2008 in forum Ask a Teacher
    Replies: 1
    Last Post: 03-Aug-2008, 19:50
  5. inspection - are these correct?
    By Zoe2008 in forum Ask a Teacher
    Replies: 3
    Last Post: 19-Jul-2008, 14:09

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •