JACEK1
Key Member
- Joined
- Feb 10, 2013
- Member Type
- Interested in Language
- Native Language
- Polish
- Home Country
- Poland
- Current Location
- Poland
Hello all forum users!
The switchboard is to be prepared for dismantling from the wall.
The switchboard is to be prepared to be dismantled from the wall.
Are both the above structures properly formulated?
Thank you.
The switchboard is to be prepared for dismantling from the wall.
The switchboard is to be prepared to be dismantled from the wall.
Are both the above structures properly formulated?
Thank you.