harris2005
New member
- Joined
- Oct 5, 2012
- Member Type
- Student or Learner
- Native Language
- American English
- Home Country
- United States
- Current Location
- United States
Revising the following memo to improve you-attitude.
Subject: Status of Building Renovations
We are happy to announce that the renovation of the lobby is not behind schedule. By Monday, October 9, we should be ready to open the west end of the lobby to limited traffic.
The final phase of the renovation will be placing a new marble floor in front of the elevators. This work will not be finished until the end of the month.
We will attempt to schedule most of the work during the evenings so that normal business is not disrupted.
Please exercise caution when moving through the construction area. The floor will be uneven and steps will be at unusual heights. Watch your step to avoid accidental tripping or falling.
Subject: Status of Building Renovations
We are happy to announce that the renovation of the lobby is not behind schedule. By Monday, October 9, we should be ready to open the west end of the lobby to limited traffic.
The final phase of the renovation will be placing a new marble floor in front of the elevators. This work will not be finished until the end of the month.
We will attempt to schedule most of the work during the evenings so that normal business is not disrupted.
Please exercise caution when moving through the construction area. The floor will be uneven and steps will be at unusual heights. Watch your step to avoid accidental tripping or falling.