Sepmre
Senior Member
- Joined
- Jan 21, 2013
- Member Type
- Student or Learner
- Native Language
- Persian
- Home Country
- Iran
- Current Location
- Iran
Hi,
Could anyone please tell me what does the underlined part mean?
and
what does the second underlined part mean?
These efforts resulted in significant ground loss as free flowing sand, above the water table, ran into the machine during the process of catching and removing the boulder. Polyurethane grouts, were injected into the soil from the face of the TBM, in an unsuccessful effort in stabilizing the granular material. This was due in part because the machine was not configured for advance grouting, so only a limited portion of the face could be treated from the TBM.
Thanks.
Could anyone please tell me what does the underlined part mean?
and
what does the second underlined part mean?
These efforts resulted in significant ground loss as free flowing sand, above the water table, ran into the machine during the process of catching and removing the boulder. Polyurethane grouts, were injected into the soil from the face of the TBM, in an unsuccessful effort in stabilizing the granular material. This was due in part because the machine was not configured for advance grouting, so only a limited portion of the face could be treated from the TBM.
Thanks.
Last edited: