Joj
Member
- Joined
- Jan 10, 2022
- Member Type
- Student or Learner
- Native Language
- Arabic
- Home Country
- Lebanon
- Current Location
- France
Hello. I hope everyone is doing well. Could you possibly assist me with correcting the email below so that I can send it to my boss?
Dear Mr. XX,
I've attached the PV system proposal for the apartments in "name of the city" building.
Please keep in mind that if we are limited in installing the panels within the roof building's boundary, we cannot install more than four panels per apartment. We can go up to 5 panels per flat if we extend above the tiles.
As previously discussed, the clients will not profit from the installation of the panels on the carport during the winter months from November to February.
I understand you intended to provide each unit six panels, but we are limited by space.
Three things you should be aware of it: (shown with picture below)
Dear Mr. XX,
I've attached the PV system proposal for the apartments in "name of the city" building.
Please keep in mind that if we are limited in installing the panels within the roof building's boundary, we cannot install more than four panels per apartment. We can go up to 5 panels per flat if we extend above the tiles.
As previously discussed, the clients will not profit from the installation of the panels on the carport during the winter months from November to February.
I understand you intended to provide each unit six panels, but we are limited by space.
Three things you should be aware of it: (shown with picture below)
- Surrounding buildings shadowing on the carport.
- A top view of the roof panels that stick to the building's borders.
- A top view of the panels extending beyond the boundaries.