Joj
Member
- Joined
- Jan 10, 2022
- Member Type
- Student or Learner
- Native Language
- Arabic
- Home Country
- Lebanon
- Current Location
- France
In this option, we provide a single-phase system with two X inverters in parallel providing 60Amps of maximum power, with 80 panels and a bank of battery that provides 20 amps for 12 hours during the night. Note that this system covers your consumptions that you mentioned in the Excel Spreadsheet. However, the needed area for the PV panels in this solution is 200m2.
In this option, we provide a single-phase system with two X inverters in parallel providing 60Amps of maximum power, with 46 panels (needed area is 100m2) and a bank of battery that provides 20 amps for 6 hours during the night. Note that this system covers half of your consumptions.
Since you use hot water everyday we highly recommend the installation of a solar water heater in your factory, in this case the energy used for the electric water heater will go to other load. If you are interested we can send you a proposal for the solar water heater.
In this option, we provide a single-phase system with two X inverters in parallel providing 60Amps of maximum power, with 46 panels (needed area is 100m2) and a bank of battery that provides 20 amps for 6 hours during the night. Note that this system covers half of your consumptions.
Since you use hot water everyday we highly recommend the installation of a solar water heater in your factory, in this case the energy used for the electric water heater will go to other load. If you are interested we can send you a proposal for the solar water heater.
Last edited: